Are you over 18 and want to see adult content?
More Annotations
A complete backup of www.jagran.com/entertainment/bollywood-shilpa-shetty-and-raj-kundra-welcome-baby-girl-samisha-shetty-kundra
Are you over 18 and want to see adult content?
A complete backup of www.businesstoday.in/trending/box-office/bhoot-part-1-the-haunted-ship-box-office-prediction-vicky-kaushal-
Are you over 18 and want to see adult content?
A complete backup of aajtak.intoday.in/story/shubh-magal-zyada-saavdhaan-review-aayushman-khurana-film-talks-about-the-life-of-g
Are you over 18 and want to see adult content?
A complete backup of www.kommersant.ru/doc/4267347
Are you over 18 and want to see adult content?
A complete backup of www.soyfutbol.com/internacional/Premier-League-El-Chelsea-y-Lampard-regresar-a-la-victoria-al-derrotar-a-un
Are you over 18 and want to see adult content?
Favourite Annotations
A complete backup of deesses-dafrique.com
Are you over 18 and want to see adult content?
A complete backup of allyourbasearebelongtous.com
Are you over 18 and want to see adult content?
A complete backup of bairdcapital.com
Are you over 18 and want to see adult content?
Text
SERVICE AREA
Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Read more. Menu Pod ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings. WATER STANDARD DRAWINGS B-563. Steel Pipeline - Pipe Pad or Coupling for Cast Iron Fittings. 04/23/21. B-566. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet, AC, PVC & DI Pipe) 05/17/00. B-567. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet - Steel Pipe)05/17/00.
CONSTRUCTION BID RESULTS 04/05/2021 6:00 AM. Close Date. 05/04/2021 5:00 PM. Refer to the Notice Inviting Bid or Addenda for Important Dates. Proposal Package. Appendix A - Approved Materials List. Appendix B - TV Recycled Water Pipeline MMRP. Appendix C - Geotechnical Investigations. Appendix D - Operational Control Strategy Sequence of Work. JOE MOUAWAD SELECTED AS EMWD GENERAL MANAGER Joe Mouawad Selected as EMWD General Manager. Post April 21, 2021. Perris, CA (April 21, 2021) — Eastern Municipal Water District’s (EMWD) Board of Directors today selected Joe Mouawad as EMWD’s next General Manager following a nationwide search. Mouawad has served in various leadership roles with EMWD for the past 15 years, bringing a SEWER STANDARD DRAWINGS For Sewer System Construction. Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. CONSTRUCTION BID OPPORTUNITIES Construction Bid Opportunities. The following construction contracts are currently out for bid. If you have difficulties accessing these documents, please contact the Field Engineering department at 951-928-3777 ext. 4435. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on orafter
BIDS/RFPS - EASTERN MUNICIPAL WATER DISTRICT Bids/RFPs. Post December 5, 2018. All solicitations (RFP’s, RFB’s, RFQ’s, etc.) for Eastern Municipal Water District are conducted through an online system hosted by Bonfire Interactive. View Current EMWD Listings hosted with Bonfire. These listings DO NOT include public works construction projects. EASTERN MUNICIPAL WATER DISTRICT Perris, CA (April 14, 2021) — Eastern Municipal Water District (EMWD) began work this month on a new water transmission pipeline in Murrieta Road in the City of Menifee. The Murrieta Road Pipeline Improvement Project will construct a 36-inch pipeline on Murrieta Road between Salt Creek and La VIEW BILL/PAYMENT OPTIONS Billing Policies. Payment Arrangement Policy. Should you wish to request a payment arrangement, you may do so through EMWD’s eBill site or Pay-by-Phone system by calling 951-383-6055. Note: Only the person on the account may be granted a payment arrangement. Payment arrangements will not be granted to delinquent accounts.SERVICE AREA
Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Read more. Menu Pod ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings. WATER STANDARD DRAWINGS B-563. Steel Pipeline - Pipe Pad or Coupling for Cast Iron Fittings. 04/23/21. B-566. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet, AC, PVC & DI Pipe) 05/17/00. B-567. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet - Steel Pipe)05/17/00.
CONSTRUCTION BID RESULTS 04/05/2021 6:00 AM. Close Date. 05/04/2021 5:00 PM. Refer to the Notice Inviting Bid or Addenda for Important Dates. Proposal Package. Appendix A - Approved Materials List. Appendix B - TV Recycled Water Pipeline MMRP. Appendix C - Geotechnical Investigations. Appendix D - Operational Control Strategy Sequence of Work. JOE MOUAWAD SELECTED AS EMWD GENERAL MANAGER Joe Mouawad Selected as EMWD General Manager. Post April 21, 2021. Perris, CA (April 21, 2021) — Eastern Municipal Water District’s (EMWD) Board of Directors today selected Joe Mouawad as EMWD’s next General Manager following a nationwide search. Mouawad has served in various leadership roles with EMWD for the past 15 years, bringing a SEWER STANDARD DRAWINGS For Sewer System Construction. Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. CONSTRUCTION BID OPPORTUNITIES Construction Bid Opportunities. The following construction contracts are currently out for bid. If you have difficulties accessing these documents, please contact the Field Engineering department at 951-928-3777 ext. 4435. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on orafter
BIDS/RFPS - EASTERN MUNICIPAL WATER DISTRICT Bids/RFPs. Post December 5, 2018. All solicitations (RFP’s, RFB’s, RFQ’s, etc.) for Eastern Municipal Water District are conducted through an online system hosted by Bonfire Interactive. View Current EMWD Listings hosted with Bonfire. These listings DO NOT include public works construction projects. EMWD’S RESPONSE TO NOVEL CORONAVIRUS (COVID-19) EMWD is well-prepared to continue providing water, wastewater and recycled water services throughout the COVID-19 pandemic. We have staff, equipment and infrastructure in place to maintain all services around the clock, while incorporating remote working and social distancing to protect the health and well-being of our employees, customers, and the community. DISTRICT ORGANIZATION Executive Office. Includes board-appointed General Manager, Joe Mouawad, P.E., who oversees two Deputy General Managers, and the Executive Branch, which then oversees Public and Governmental Affairs. One Deputy General Manager oversees the Administrative Services Branch and one Deputy General Manager oversees the Operations and Maintenance BILLING AND ACCOUNT MANAGEMENT Billing and Account Management. To hear your account balance and due date over the phone, please use EMWD’s Pay-by-Phone system by calling 951-383-6055. EMWD’s Customer Service department is available Monday through Friday, between the hours of 8:00 a.m. and 5:00 p.m. You may contact Customer Service directly by calling1-800-426-3693.
SEWER STANDARD DRAWINGS For Sewer System Construction. Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. CHARGES AND DEPOSITS Sewer Financial Participation Charge. $2,958/EDU**. Sewer Treatment Plant Capacity Charge. $6,027/EDU**. Water Supply Development Fee. $300/EDU**. Landscape Water Financial Participation Charge. $5,069/EMS*. Note: The estimated amounts of all applicable Financial Participation Charges and other EMWD charges paid by Sponsor shall besubject to
APPROVED RATES AND FEES FOR 2020 AND 2021 Approved Rates and Fees for 2020 and 2021. Post May 2, 2019. EMWD is a government agency that provides services based on the actual cost of operation and maintenance. The EMWD Board of Directors adopts a biennial operating budget that goes into effect on BIDS/RFPS - EASTERN MUNICIPAL WATER DISTRICT Bids/RFPs. Post December 5, 2018. All solicitations (RFP’s, RFB’s, RFQ’s, etc.) for Eastern Municipal Water District are conducted through an online system hosted by Bonfire Interactive. View Current EMWD Listings hosted with Bonfire. These listings DO NOT include public works construction projects. VARIANCE REQUEST FORM 8. Other Instances: There may be instances where an increased allocation on a permanent or temporary basis may be appropriate. If you believe that is the case, please provide the details below and submit any documentation you may have via email (variance@emwd.org), fax (951-928-6145), or mail (Attn: Customer Service Dept., Eastern Municipal Water District, 2270 Trumble Road, P.O. Box 8300 APPENDIX A APPROVED MATERIALS LIST 6 of 54 PAGES Appendix A Rev: 4/15/2021 2. FIRE HYDRANTS 1 of 2 Description Manufacturers 1. BLOW-OFF HYDRANT JONES Model: J-344 –4” x 1-2 ½”
EASTERN MUNICIPAL WATER DISTRICT SMALL SEWAGE LIFT … Last Update: 07/12/16 TABLE OF CONTENTS (C ontinued) iii SMALL SEWAGE LIFT STATION STANDARD DRAWINGS (11 x 17) DRAWING FILE Single Line Diagram (W ithout Standby Generator), MCC Plan and EASTERN MUNICIPAL WATER DISTRICT Perris, CA (April 14, 2021) — Eastern Municipal Water District (EMWD) began work this month on a new water transmission pipeline in Murrieta Road in the City of Menifee. The Murrieta Road Pipeline Improvement Project will construct a 36-inch pipeline on Murrieta Road between Salt Creek and La VIEW BILL/PAYMENT OPTIONS Billing Policies. Payment Arrangement Policy. Should you wish to request a payment arrangement, you may do so through EMWD’s eBill site or Pay-by-Phone system by calling 951-383-6055. Note: Only the person on the account may be granted a payment arrangement. Payment arrangements will not be granted to delinquent accounts. ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings. WATER STANDARD DRAWINGS B-563. Steel Pipeline - Pipe Pad or Coupling for Cast Iron Fittings. 04/23/21. B-566. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet, AC, PVC & DI Pipe) 05/17/00. B-567. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet - Steel Pipe)05/17/00.
CONSTRUCTION BID RESULTS 04/05/2021 6:00 AM. Close Date. 05/04/2021 5:00 PM. Refer to the Notice Inviting Bid or Addenda for Important Dates. Proposal Package. Appendix A - Approved Materials List. Appendix B - TV Recycled Water Pipeline MMRP. Appendix C - Geotechnical Investigations. Appendix D - Operational Control Strategy Sequence of Work. SEWER STANDARD DRAWINGS For Sewer System Construction. Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. CONSTRUCTION BID OPPORTUNITIES Construction Bid Opportunities. The following construction contracts are currently out for bid. If you have difficulties accessing these documents, please contact the Field Engineering department at 951-928-3777 ext. 4435. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on orafter
BIDS/RFPS - EASTERN MUNICIPAL WATER DISTRICT Bids/RFPs. Post December 5, 2018. All solicitations (RFP’s, RFB’s, RFQ’s, etc.) for Eastern Municipal Water District are conducted through an online system hosted by Bonfire Interactive. View Current EMWD Listings hosted with Bonfire. These listings DO NOT include public works construction projects. SUSTAINABLE GROUNDWATER MANAGEMENT ACT SGMA requires that groundwater basins be managed to ensure long-term water supply sustainability and prevent undesirable results. The Sustainable Groundwater Management Act (SGMA) is composed of a three-bill legislative package including Assembly Bill 1739 (Dickinson), Senate Bill 1168 (Pavley), and Senate Bill 1319 (Pavley). Additional Resources. GUIDELINES FOR BOOSTER PUMP STATIONS, LIFT STATIONS AND Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. EASTERN MUNICIPAL WATER DISTRICT Perris, CA (April 14, 2021) — Eastern Municipal Water District (EMWD) began work this month on a new water transmission pipeline in Murrieta Road in the City of Menifee. The Murrieta Road Pipeline Improvement Project will construct a 36-inch pipeline on Murrieta Road between Salt Creek and La VIEW BILL/PAYMENT OPTIONS Billing Policies. Payment Arrangement Policy. Should you wish to request a payment arrangement, you may do so through EMWD’s eBill site or Pay-by-Phone system by calling 951-383-6055. Note: Only the person on the account may be granted a payment arrangement. Payment arrangements will not be granted to delinquent accounts. ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings. WATER STANDARD DRAWINGS B-563. Steel Pipeline - Pipe Pad or Coupling for Cast Iron Fittings. 04/23/21. B-566. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet, AC, PVC & DI Pipe) 05/17/00. B-567. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet - Steel Pipe)05/17/00.
CONSTRUCTION BID RESULTS 04/05/2021 6:00 AM. Close Date. 05/04/2021 5:00 PM. Refer to the Notice Inviting Bid or Addenda for Important Dates. Proposal Package. Appendix A - Approved Materials List. Appendix B - TV Recycled Water Pipeline MMRP. Appendix C - Geotechnical Investigations. Appendix D - Operational Control Strategy Sequence of Work. SEWER STANDARD DRAWINGS For Sewer System Construction. Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. CONSTRUCTION BID OPPORTUNITIES Construction Bid Opportunities. The following construction contracts are currently out for bid. If you have difficulties accessing these documents, please contact the Field Engineering department at 951-928-3777 ext. 4435. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on orafter
BIDS/RFPS - EASTERN MUNICIPAL WATER DISTRICT Bids/RFPs. Post December 5, 2018. All solicitations (RFP’s, RFB’s, RFQ’s, etc.) for Eastern Municipal Water District are conducted through an online system hosted by Bonfire Interactive. View Current EMWD Listings hosted with Bonfire. These listings DO NOT include public works construction projects. SUSTAINABLE GROUNDWATER MANAGEMENT ACT SGMA requires that groundwater basins be managed to ensure long-term water supply sustainability and prevent undesirable results. The Sustainable Groundwater Management Act (SGMA) is composed of a three-bill legislative package including Assembly Bill 1739 (Dickinson), Senate Bill 1168 (Pavley), and Senate Bill 1319 (Pavley). Additional Resources. GUIDELINES FOR BOOSTER PUMP STATIONS, LIFT STATIONS AND Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings.SERVICE AREA
Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Read more. Menu Pod DISTRICT ORGANIZATION Executive Office. Includes board-appointed General Manager, Joe Mouawad, P.E., who oversees two Deputy General Managers, and the Executive Branch, which then oversees Public and Governmental Affairs. One Deputy General Manager oversees the Administrative Services Branch and one Deputy General Manager oversees the Operations and Maintenance CHARGES AND DEPOSITS Sewer Financial Participation Charge. $2,958/EDU**. Sewer Treatment Plant Capacity Charge. $6,027/EDU**. Water Supply Development Fee. $300/EDU**. Landscape Water Financial Participation Charge. $5,069/EMS*. Note: The estimated amounts of all applicable Financial Participation Charges and other EMWD charges paid by Sponsor shall besubject to
CONSTRUCTION BID RESULTS 04/05/2021 6:00 AM. Close Date. 05/04/2021 5:00 PM. Refer to the Notice Inviting Bid or Addenda for Important Dates. Proposal Package. Appendix A - Approved Materials List. Appendix B - TV Recycled Water Pipeline MMRP. Appendix C - Geotechnical Investigations. Appendix D - Operational Control Strategy Sequence of Work. SEWER STANDARD DRAWINGS For Sewer System Construction. Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. APPROVED RATES AND FEES FOR 2020 AND 2021 Approved Rates and Fees for 2020 and 2021. Post May 2, 2019. EMWD is a government agency that provides services based on the actual cost of operation and maintenance. The EMWD Board of Directors adopts a biennial operating budget that goes into effect on GUIDELINES FOR BOOSTER PUMP STATIONS, LIFT STATIONS AND Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. SUSTAINABLE GROUNDWATER MANAGEMENT ACT SGMA requires that groundwater basins be managed to ensure long-term water supply sustainability and prevent undesirable results. The Sustainable Groundwater Management Act (SGMA) is composed of a three-bill legislative package including Assembly Bill 1739 (Dickinson), Senate Bill 1168 (Pavley), and Senate Bill 1319 (Pavley). Additional Resources. JOB CLASSIFICATIONS AND WAGES Job Classifications and Wages. Every position is assigned a Range Number that corresponds with EMWD’s Payscale. Upon hiring, employees are assigned a specific step within their position’s range and are eligible to move up to higher steps within their range in conjunction with annual performance evaluations. The “control point” is the EASTERN MUNICIPAL WATER DISTRICT Perris, CA (April 14, 2021) — Eastern Municipal Water District (EMWD) began work this month on a new water transmission pipeline in Murrieta Road in the City of Menifee. The Murrieta Road Pipeline Improvement Project will construct a 36-inch pipeline on Murrieta Road between Salt Creek and La VIEW BILL/PAYMENT OPTIONS Billing Policies. Payment Arrangement Policy. Should you wish to request a payment arrangement, you may do so through EMWD’s eBill site or Pay-by-Phone system by calling 951-383-6055. Note: Only the person on the account may be granted a payment arrangement. Payment arrangements will not be granted to delinquent accounts. ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings. WATER STANDARD DRAWINGS B-563. Steel Pipeline - Pipe Pad or Coupling for Cast Iron Fittings. 04/23/21. B-566. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet, AC, PVC & DI Pipe) 05/17/00. B-567. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet - Steel Pipe)05/17/00.
CONSTRUCTION BID RESULTS 04/05/2021 6:00 AM. Close Date. 05/04/2021 5:00 PM. Refer to the Notice Inviting Bid or Addenda for Important Dates. Proposal Package. Appendix A - Approved Materials List. Appendix B - TV Recycled Water Pipeline MMRP. Appendix C - Geotechnical Investigations. Appendix D - Operational Control Strategy Sequence of Work. SEWER STANDARD DRAWINGS For Sewer System Construction. Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. CONSTRUCTION BID OPPORTUNITIES Construction Bid Opportunities. The following construction contracts are currently out for bid. If you have difficulties accessing these documents, please contact the Field Engineering department at 951-928-3777 ext. 4435. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on orafter
BIDS/RFPS - EASTERN MUNICIPAL WATER DISTRICT Bids/RFPs. Post December 5, 2018. All solicitations (RFP’s, RFB’s, RFQ’s, etc.) for Eastern Municipal Water District are conducted through an online system hosted by Bonfire Interactive. View Current EMWD Listings hosted with Bonfire. These listings DO NOT include public works construction projects. SUSTAINABLE GROUNDWATER MANAGEMENT ACT SGMA requires that groundwater basins be managed to ensure long-term water supply sustainability and prevent undesirable results. The Sustainable Groundwater Management Act (SGMA) is composed of a three-bill legislative package including Assembly Bill 1739 (Dickinson), Senate Bill 1168 (Pavley), and Senate Bill 1319 (Pavley). Additional Resources. GUIDELINES FOR BOOSTER PUMP STATIONS, LIFT STATIONS AND Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. EASTERN MUNICIPAL WATER DISTRICT Perris, CA (April 14, 2021) — Eastern Municipal Water District (EMWD) began work this month on a new water transmission pipeline in Murrieta Road in the City of Menifee. The Murrieta Road Pipeline Improvement Project will construct a 36-inch pipeline on Murrieta Road between Salt Creek and La VIEW BILL/PAYMENT OPTIONS Billing Policies. Payment Arrangement Policy. Should you wish to request a payment arrangement, you may do so through EMWD’s eBill site or Pay-by-Phone system by calling 951-383-6055. Note: Only the person on the account may be granted a payment arrangement. Payment arrangements will not be granted to delinquent accounts. ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings. WATER STANDARD DRAWINGS B-563. Steel Pipeline - Pipe Pad or Coupling for Cast Iron Fittings. 04/23/21. B-566. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet, AC, PVC & DI Pipe) 05/17/00. B-567. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet - Steel Pipe)05/17/00.
CONSTRUCTION BID RESULTS 04/05/2021 6:00 AM. Close Date. 05/04/2021 5:00 PM. Refer to the Notice Inviting Bid or Addenda for Important Dates. Proposal Package. Appendix A - Approved Materials List. Appendix B - TV Recycled Water Pipeline MMRP. Appendix C - Geotechnical Investigations. Appendix D - Operational Control Strategy Sequence of Work. SEWER STANDARD DRAWINGS For Sewer System Construction. Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. CONSTRUCTION BID OPPORTUNITIES Construction Bid Opportunities. The following construction contracts are currently out for bid. If you have difficulties accessing these documents, please contact the Field Engineering department at 951-928-3777 ext. 4435. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on orafter
BIDS/RFPS - EASTERN MUNICIPAL WATER DISTRICT Bids/RFPs. Post December 5, 2018. All solicitations (RFP’s, RFB’s, RFQ’s, etc.) for Eastern Municipal Water District are conducted through an online system hosted by Bonfire Interactive. View Current EMWD Listings hosted with Bonfire. These listings DO NOT include public works construction projects. SUSTAINABLE GROUNDWATER MANAGEMENT ACT SGMA requires that groundwater basins be managed to ensure long-term water supply sustainability and prevent undesirable results. The Sustainable Groundwater Management Act (SGMA) is composed of a three-bill legislative package including Assembly Bill 1739 (Dickinson), Senate Bill 1168 (Pavley), and Senate Bill 1319 (Pavley). Additional Resources. GUIDELINES FOR BOOSTER PUMP STATIONS, LIFT STATIONS AND Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings.SERVICE AREA
Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Read more. Menu Pod DISTRICT ORGANIZATION Executive Office. Includes board-appointed General Manager, Joe Mouawad, P.E., who oversees two Deputy General Managers, and the Executive Branch, which then oversees Public and Governmental Affairs. One Deputy General Manager oversees the Administrative Services Branch and one Deputy General Manager oversees the Operations and Maintenance CONSTRUCTION BID RESULTS 04/05/2021 6:00 AM. Close Date. 05/04/2021 5:00 PM. Refer to the Notice Inviting Bid or Addenda for Important Dates. Proposal Package. Appendix A - Approved Materials List. Appendix B - TV Recycled Water Pipeline MMRP. Appendix C - Geotechnical Investigations. Appendix D - Operational Control Strategy Sequence of Work. CHARGES AND DEPOSITS Sewer Financial Participation Charge. $2,958/EDU**. Sewer Treatment Plant Capacity Charge. $6,027/EDU**. Water Supply Development Fee. $300/EDU**. Landscape Water Financial Participation Charge. $5,069/EMS*. Note: The estimated amounts of all applicable Financial Participation Charges and other EMWD charges paid by Sponsor shall besubject to
SEWER STANDARD DRAWINGS For Sewer System Construction. Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. APPROVED RATES AND FEES FOR 2020 AND 2021 Approved Rates and Fees for 2020 and 2021. Post May 2, 2019. EMWD is a government agency that provides services based on the actual cost of operation and maintenance. The EMWD Board of Directors adopts a biennial operating budget that goes into effect on GUIDELINES FOR BOOSTER PUMP STATIONS, LIFT STATIONS AND Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. SUSTAINABLE GROUNDWATER MANAGEMENT ACT SGMA requires that groundwater basins be managed to ensure long-term water supply sustainability and prevent undesirable results. The Sustainable Groundwater Management Act (SGMA) is composed of a three-bill legislative package including Assembly Bill 1739 (Dickinson), Senate Bill 1168 (Pavley), and Senate Bill 1319 (Pavley). Additional Resources. JOB CLASSIFICATIONS AND WAGES Job Classifications and Wages. Every position is assigned a Range Number that corresponds with EMWD’s Payscale. Upon hiring, employees are assigned a specific step within their position’s range and are eligible to move up to higher steps within their range in conjunction with annual performance evaluations. The “control point” is the EASTERN MUNICIPAL WATER DISTRICT Perris, CA (April 14, 2021) — Eastern Municipal Water District (EMWD) began work this month on a new water transmission pipeline in Murrieta Road in the City of Menifee. The Murrieta Road Pipeline Improvement Project will construct a 36-inch pipeline on Murrieta Road between Salt Creek and La VIEW BILL/PAYMENT OPTIONS Billing Policies. Payment Arrangement Policy. Should you wish to request a payment arrangement, you may do so through EMWD’s eBill site or Pay-by-Phone system by calling 951-383-6055. Note: Only the person on the account may be granted a payment arrangement. Payment arrangements will not be granted to delinquent accounts. ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings. BILLING AND ACCOUNT MANAGEMENT Billing and Account Management. To hear your account balance and due date over the phone, please use EMWD’s Pay-by-Phone system by calling 951-383-6055. EMWD’s Customer Service department is available Monday through Friday, between the hours of 8:00 a.m. and 5:00 p.m. You may contact Customer Service directly by calling1-800-426-3693.
START/STOP SERVICE
You will need to work with EMWD's Customer Service department to start/stop water and/or sewer service to the property that SEWER STANDARD DRAWINGS For Sewer System Construction. Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. WATER STANDARD DRAWINGS B-563. Steel Pipeline - Pipe Pad or Coupling for Cast Iron Fittings. 04/23/21. B-566. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet, AC, PVC & DI Pipe) 05/17/00. B-567. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet - Steel Pipe)05/17/00.
ENGINEERING BRANCH CONTACTS Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Read more. Menu Pod CAREER OPPORTUNITIES Career Opportunities. Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Headquartered in Perris, California, employees enjoy a ruralatmosphere.
BIDS/RFPS - EASTERN MUNICIPAL WATER DISTRICT Bids/RFPs. Post December 5, 2018. All solicitations (RFP’s, RFB’s, RFQ’s, etc.) for Eastern Municipal Water District are conducted through an online system hosted by Bonfire Interactive. View Current EMWD Listings hosted with Bonfire. These listings DO NOT include public works construction projects. EASTERN MUNICIPAL WATER DISTRICT Perris, CA (April 14, 2021) — Eastern Municipal Water District (EMWD) began work this month on a new water transmission pipeline in Murrieta Road in the City of Menifee. The Murrieta Road Pipeline Improvement Project will construct a 36-inch pipeline on Murrieta Road between Salt Creek and La VIEW BILL/PAYMENT OPTIONS Billing Policies. Payment Arrangement Policy. Should you wish to request a payment arrangement, you may do so through EMWD’s eBill site or Pay-by-Phone system by calling 951-383-6055. Note: Only the person on the account may be granted a payment arrangement. Payment arrangements will not be granted to delinquent accounts. ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings. BILLING AND ACCOUNT MANAGEMENT Billing and Account Management. To hear your account balance and due date over the phone, please use EMWD’s Pay-by-Phone system by calling 951-383-6055. EMWD’s Customer Service department is available Monday through Friday, between the hours of 8:00 a.m. and 5:00 p.m. You may contact Customer Service directly by calling1-800-426-3693.
START/STOP SERVICE
You will need to work with EMWD's Customer Service department to start/stop water and/or sewer service to the property that SEWER STANDARD DRAWINGS For Sewer System Construction. Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. WATER STANDARD DRAWINGS B-563. Steel Pipeline - Pipe Pad or Coupling for Cast Iron Fittings. 04/23/21. B-566. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet, AC, PVC & DI Pipe) 05/17/00. B-567. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet - Steel Pipe)05/17/00.
ENGINEERING BRANCH CONTACTS Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Read more. Menu Pod CAREER OPPORTUNITIES Career Opportunities. Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Headquartered in Perris, California, employees enjoy a ruralatmosphere.
BIDS/RFPS - EASTERN MUNICIPAL WATER DISTRICT Bids/RFPs. Post December 5, 2018. All solicitations (RFP’s, RFB’s, RFQ’s, etc.) for Eastern Municipal Water District are conducted through an online system hosted by Bonfire Interactive. View Current EMWD Listings hosted with Bonfire. These listings DO NOT include public works construction projects. ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings. DISTRICT ORGANIZATION Executive Office. Includes board-appointed General Manager, Joe Mouawad, P.E., who oversees two Deputy General Managers, and the Executive Branch, which then oversees Public and Governmental Affairs. One Deputy General Manager oversees the Administrative Services Branch and one Deputy General Manager oversees the Operations and Maintenance CAREER OPPORTUNITIES Career Opportunities. Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Headquartered in Perris, California, employees enjoy a ruralatmosphere.
APPLY FOR CURRENT OPENINGS Apply for Current Job Openings. If you would enjoy working in a dynamic environment and are looking for an opportunity to become part of a stellar team of professionals, we invite you to apply online today by following the links below. Our guiding principles are Innovation, Responsibility, Safety, Integrity, Community, Respect,Leadership and
RESIDENTIAL PROGRAMS & REBATES Smart Controller Direct Install Program. Weather-Based (Smart) Irrigation Controllers automatically adjust your irrigation schedule to account for changing weather, as well as plant and soil types. Residential Smart Controller Direct Install Program Participation Request, Agreement and Disclaimer Form. Read more. Webform January 17,2019.
CONSTRUCTION BID RESULTS 04/05/2021 6:00 AM. Close Date. 05/04/2021 5:00 PM. Refer to the Notice Inviting Bid or Addenda for Important Dates. Proposal Package. Appendix A - Approved Materials List. Appendix B - TV Recycled Water Pipeline MMRP. Appendix C - Geotechnical Investigations. Appendix D - Operational Control Strategy Sequence of Work. CHARGES AND DEPOSITS Sewer Financial Participation Charge. $2,958/EDU**. Sewer Treatment Plant Capacity Charge. $6,027/EDU**. Water Supply Development Fee. $300/EDU**. Landscape Water Financial Participation Charge. $5,069/EMS*. Note: The estimated amounts of all applicable Financial Participation Charges and other EMWD charges paid by Sponsor shall besubject to
JOB CLASSIFICATIONS AND WAGES Job Classifications and Wages. Every position is assigned a Range Number that corresponds with EMWD’s Payscale. Upon hiring, employees are assigned a specific step within their position’s range and are eligible to move up to higher steps within their range in conjunction with annual performance evaluations. The “control point” is the SUSTAINABLE GROUNDWATER MANAGEMENT ACT SGMA requires that groundwater basins be managed to ensure long-term water supply sustainability and prevent undesirable results. The Sustainable Groundwater Management Act (SGMA) is composed of a three-bill legislative package including Assembly Bill 1739 (Dickinson), Senate Bill 1168 (Pavley), and Senate Bill 1319 (Pavley). Additional Resources. GUIDELINES FOR BOOSTER PUMP STATIONS, LIFT STATIONS AND Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. EASTERN MUNICIPAL WATER DISTRICT Perris, CA (April 14, 2021) — Eastern Municipal Water District (EMWD) began work this month on a new water transmission pipeline in Murrieta Road in the City of Menifee. The Murrieta Road Pipeline Improvement Project will construct a 36-inch pipeline on Murrieta Road between Salt Creek and La VIEW BILL/PAYMENT OPTIONS Billing Policies. Payment Arrangement Policy. Should you wish to request a payment arrangement, you may do so through EMWD’s eBill site or Pay-by-Phone system by calling 951-383-6055. Note: Only the person on the account may be granted a payment arrangement. Payment arrangements will not be granted to delinquent accounts. ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings. BILLING AND ACCOUNT MANAGEMENT Billing and Account Management. To hear your account balance and due date over the phone, please use EMWD’s Pay-by-Phone system by calling 951-383-6055. EMWD’s Customer Service department is available Monday through Friday, between the hours of 8:00 a.m. and 5:00 p.m. You may contact Customer Service directly by calling1-800-426-3693.
START/STOP SERVICE
You will need to work with EMWD's Customer Service department to start/stop water and/or sewer service to the property that SEWER STANDARD DRAWINGS For Sewer System Construction. Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. WATER STANDARD DRAWINGS B-563. Steel Pipeline - Pipe Pad or Coupling for Cast Iron Fittings. 04/23/21. B-566. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet, AC, PVC & DI Pipe) 05/17/00. B-567. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet - Steel Pipe)05/17/00.
ENGINEERING BRANCH CONTACTS Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Read more. Menu Pod CAREER OPPORTUNITIES Career Opportunities. Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Headquartered in Perris, California, employees enjoy a ruralatmosphere.
BIDS/RFPS - EASTERN MUNICIPAL WATER DISTRICT Bids/RFPs. Post December 5, 2018. All solicitations (RFP’s, RFB’s, RFQ’s, etc.) for Eastern Municipal Water District are conducted through an online system hosted by Bonfire Interactive. View Current EMWD Listings hosted with Bonfire. These listings DO NOT include public works construction projects. EASTERN MUNICIPAL WATER DISTRICT Perris, CA (April 14, 2021) — Eastern Municipal Water District (EMWD) began work this month on a new water transmission pipeline in Murrieta Road in the City of Menifee. The Murrieta Road Pipeline Improvement Project will construct a 36-inch pipeline on Murrieta Road between Salt Creek and La VIEW BILL/PAYMENT OPTIONS Billing Policies. Payment Arrangement Policy. Should you wish to request a payment arrangement, you may do so through EMWD’s eBill site or Pay-by-Phone system by calling 951-383-6055. Note: Only the person on the account may be granted a payment arrangement. Payment arrangements will not be granted to delinquent accounts. ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings. BILLING AND ACCOUNT MANAGEMENT Billing and Account Management. To hear your account balance and due date over the phone, please use EMWD’s Pay-by-Phone system by calling 951-383-6055. EMWD’s Customer Service department is available Monday through Friday, between the hours of 8:00 a.m. and 5:00 p.m. You may contact Customer Service directly by calling1-800-426-3693.
START/STOP SERVICE
You will need to work with EMWD's Customer Service department to start/stop water and/or sewer service to the property that SEWER STANDARD DRAWINGS For Sewer System Construction. Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. WATER STANDARD DRAWINGS B-563. Steel Pipeline - Pipe Pad or Coupling for Cast Iron Fittings. 04/23/21. B-566. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet, AC, PVC & DI Pipe) 05/17/00. B-567. 6" x 2 - 2 1/2" x 1 - 4" Fire Hydrant Installation (City of Hemet - Steel Pipe)05/17/00.
ENGINEERING BRANCH CONTACTS Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Read more. Menu Pod CAREER OPPORTUNITIES Career Opportunities. Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Headquartered in Perris, California, employees enjoy a ruralatmosphere.
BIDS/RFPS - EASTERN MUNICIPAL WATER DISTRICT Bids/RFPs. Post December 5, 2018. All solicitations (RFP’s, RFB’s, RFQ’s, etc.) for Eastern Municipal Water District are conducted through an online system hosted by Bonfire Interactive. View Current EMWD Listings hosted with Bonfire. These listings DO NOT include public works construction projects. ENGINEERING STANDARDS, SPECIFICATIONS AND DRAWINGS Provisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings. DISTRICT ORGANIZATION Executive Office. Includes board-appointed General Manager, Joe Mouawad, P.E., who oversees two Deputy General Managers, and the Executive Branch, which then oversees Public and Governmental Affairs. One Deputy General Manager oversees the Administrative Services Branch and one Deputy General Manager oversees the Operations and Maintenance CAREER OPPORTUNITIES Career Opportunities. Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. It is California’s sixth-largest retail water agency. Headquartered in Perris, California, employees enjoy a ruralatmosphere.
APPLY FOR CURRENT OPENINGS Apply for Current Job Openings. If you would enjoy working in a dynamic environment and are looking for an opportunity to become part of a stellar team of professionals, we invite you to apply online today by following the links below. Our guiding principles are Innovation, Responsibility, Safety, Integrity, Community, Respect,Leadership and
RESIDENTIAL PROGRAMS & REBATES Smart Controller Direct Install Program. Weather-Based (Smart) Irrigation Controllers automatically adjust your irrigation schedule to account for changing weather, as well as plant and soil types. Residential Smart Controller Direct Install Program Participation Request, Agreement and Disclaimer Form. Read more. Webform January 17,2019.
CONSTRUCTION BID RESULTS 04/05/2021 6:00 AM. Close Date. 05/04/2021 5:00 PM. Refer to the Notice Inviting Bid or Addenda for Important Dates. Proposal Package. Appendix A - Approved Materials List. Appendix B - TV Recycled Water Pipeline MMRP. Appendix C - Geotechnical Investigations. Appendix D - Operational Control Strategy Sequence of Work. CHARGES AND DEPOSITS Sewer Financial Participation Charge. $2,958/EDU**. Sewer Treatment Plant Capacity Charge. $6,027/EDU**. Water Supply Development Fee. $300/EDU**. Landscape Water Financial Participation Charge. $5,069/EMS*. Note: The estimated amounts of all applicable Financial Participation Charges and other EMWD charges paid by Sponsor shall besubject to
JOB CLASSIFICATIONS AND WAGES Job Classifications and Wages. Every position is assigned a Range Number that corresponds with EMWD’s Payscale. Upon hiring, employees are assigned a specific step within their position’s range and are eligible to move up to higher steps within their range in conjunction with annual performance evaluations. The “control point” is the SUSTAINABLE GROUNDWATER MANAGEMENT ACT SGMA requires that groundwater basins be managed to ensure long-term water supply sustainability and prevent undesirable results. The Sustainable Groundwater Management Act (SGMA) is composed of a three-bill legislative package including Assembly Bill 1739 (Dickinson), Senate Bill 1168 (Pavley), and Senate Bill 1319 (Pavley). Additional Resources. GUIDELINES FOR BOOSTER PUMP STATIONS, LIFT STATIONS AND Join EMWD Located in southwest Riverside County, EMWD is the water, wastewater service and recycled water provider to more than 825,000 people living and working within a 555-square mile service area. EMWD’s Board of Directors and General Manager invite you to watch our 2020 State of the District to learn about major projects and initiatives that will help shape the future of the organization and community. See the 2020 State of the DistrictGot it!
We use cookies to offer you a better browsing experience. By using our site, you consent to our use of cookies. Information about how EMWD will use your information can be found within EMWD's Privacy Policy.Learn More
Got it!
Skip to main content Skip to site navigation Eastern Municipal Water DistrictEMWD
Eastern Municipal Water District (EMWD) is the water, wastewater service and recycled water provider to Riverside County.Search Menu
More options
* Customers
* 24/7 Emergency Information * Billing and Account Management* Rates and Fees
Menu Pod December 21, 2018PAY MY BILL ONLINE
USE EMWD'S EBILL SYSTEM TO VIEW/PAY YOUR BILL ONLINE!* Read more
* Stay WaterWise
* About EMWD's Demonstration Garden * WaterWise Landscape Toolbox * WaterWise Programs and Rebates * Water Use Efficiency Requirements* Check For Leaks
* Report Water Waste Menu Pod March 11, 2019 INLAND EMPIRE LANDSCAPE GUIDEBOOK SAMPLE LANDSCAPE DESIGNS AND GARDENING HOW-TO TIPS.* Read more
* Education
* Activities & Downloads* Contests
* Field Trips & Tours * Theater Assembly Program * Educator Resources * Glossary of Water Terms * Water Links (Other Resources) Menu Pod January 15, 2019 EMWD’S EDUCATION PROGRAM PROMOTING WISE WATER USE AMONG THE FUTURE LEADERS OF OUR COMMUNITY.* Read more
* GWR Plus
* Doing Business
* Construction
* Development
* Vendors
Menu Pod January 19, 2019PUBLIC MAP PORTAL
EMWD MAPPING TOOL
* Read more
* Our Services
* Drinking Water Service * Wastewater Service * Recycled Water Service* Service Area
* Water Supply
* EMWD Construction Updates* Who We Are
* History
* Board of Directors * Mission, Vision and Guiding Principles * District Organization * Career Opportunities * Financial Information * Legislative Affairs* Public Affairs
* Newsroom
* Transparency Information * Tell Us How We're Doing* Accessibility
Menu Pod April 30, 2019 LEARN MORE ABOUT YOUR WATER QUALITY EMWD PERFORMS MORE THAN 40,000 TESTS TO MONITOR AND ENSURE QUALITY.* Read more
Menu Pod March 1, 2019JOIN EMWD
LOCATED IN SOUTHWEST RIVERSIDE COUNTY, EMWD IS THE WATER, WASTEWATER SERVICE AND RECYCLED WATER PROVIDER TO MORE THAN 825,000 PEOPLE LIVING AND WORKING WITHIN A 555-SQUARE MILE SERVICE AREA. IT IS CALIFORNIA’S SIXTH-LARGEST RETAIL WATER AGENCY.* Read more
Language
Select
LanguageAfrikaansAlbanianAmharicArabicArmenianAzerbaijaniBasqueBelarusianBengaliBosnianBulgarianCatalanCebuanoChichewaChinese(Simplified)Chinese
(Traditional)CorsicanCroatianCzechDanishDutchEsperantoEstonianFilipinoFinnishFrenchFrisianGalicianGeorgianGermanGreekGujaratiHaitian CreoleHausaHawaiianHebrewHindiHmongHungarianIcelandicIgboIndonesianIrishItalianJapaneseJavaneseKannadaKazakhKhmerKinyarwandaKoreanKurdish (Kurmanji)KyrgyzLaoLatinLatvianLithuanianLuxembourgishMacedonianMalagasyMalayMalayalamMalteseMaoriMarathiMongolianMyanmar (Burmese)NepaliNorwegianOdia (Oriya)PashtoPersianPolishPortuguesePunjabiRomanianRussianSamoanScots GaelicSerbianSesothoShonaSindhiSinhalaSlovakSlovenianSomaliSpanishSundaneseSwahiliSwedishTajikTamilTatarTeluguThaiTurkishTurkmenUkrainianUrduUyghurUzbekVietnameseWelshXhosaYiddishYorubaZuluPowered by Translate ContactUs Pay My Bill
Post November 26, 2018 EACH EMWD FACILITY HAS AN AVERAGE OF 30 PERCENT OF ITS ENERGY USAGE PROVIDED THROUGH THE SOLAR FACILITIES.* Read more
Post November 26, 2018 AN INDUSTRY LEADER IN RECYCLED WATER, EMWD ANNUALLY USES 100 PERCENT OF ITS RECYCLED WATER SUPPLY FOR BENEFICIAL USE THROUGHOUT ITS 555-SQUARE MILE SERVICE AREA.* Read more
* 1
* 2
PlayPause
GET STARTED
Post November 26, 2018CAREERS AT EMWD
* Read more
Post November 26, 2018 PROGRAMS AND REBATES* Read more
Post November 26, 2018 EVENTS AND MEETINGS CALENDAR* Read more
Post November 26, 2018 EMWD INFRASTRUCTURE UPDATES* Read more
Post November 26, 2018 24/7 EMERGENCY INFORMATION* Read more
HOME
Residential CustomerCommercial CustomerEducator / StudentContractorDeveloperVendor Residential Customer Post September 9, 2019 RESIDENTIAL CUSTOMER SEE HOW EMWD RATES COMPARERead More
* Read More
* Learn More About Your Water Quality * Residential Budgets and Rates * Other Bill Payment Options * Start/Stop Service * Water Budget Variances * 24/7 Emergency Information * Residential Programs and RebatesCommercial Customer
Post November 26, 2018COMMERCIAL CUSTOMER
BENEFITS OF RECYCLED WATER As the industry leader in recycled water EMWD is proud to offer a safe, cost-effective and drought-resistant water supply for its recycled water customers. Recycled Water Service* Read more
* 24/7 Emergency Information * Start/Stop Service * Forms for New Development Process * View Bill/Payment Options * Water Budget Variances * Commercial Programs & Rebates * Multi-Family Programs & Rebates * Commercial, Institutional and Industrial Budgets and RatesEducator / Student
Post November 26, 2018EDUCATOR / STUDENT
WATER EDUCATION
EMWD’s Education Program fosters an understanding of water and wastewater issues, and promotes wise water use among the future leaders of our community.Check it out!
* Read more
* Resources for Educators* Field Trips
* The Water Cycle
* Solar Cup
* Annual Poster Contest * Annual Write-Off ContestContractor
Post January 15, 2019CONTRACTOR
CONSTRUCTION BID OPPORTUNITIES EMWD makes every effort to make all aspects of the contracting process as easy and reliable as possible. Find Your Next Opportunity* Read more
* Planholder Registration by Project * Capital Improvement Project Standards * EMWD Standard Detailed Provisions * EMWD Boilerplate Documents for Engineering ProvisionsDeveloper
Post November 26, 2018DEVELOPER
DEVELOPER PROJECT HELP DESK EMWD provides commercial developers the information they need fortheir projects.
Visit the Help Desk
* Read more
* New Development Process * Forms for New Development Process * Engineering Standards, Specifications and Drawings * EMWD Infrastructure UpdatesVendor
Post November 26, 2018VENDOR
VENDOR REGISTRATION
All goods and services are advertised and managed by EMWD’s Purchasing and Contracts division. Formal solicitations are conductedthrough Bonfire.
Register Today
* Read more
* Bids/RFPs
* Procurement Methods * Surplus Equipment and Materials * Purchasing and Contracts ContactsHELPFUL VIDEOS
Video April 24, 2019 LEARN MORE ABOUT EMWD’S DESALINATION PROGRAM* Read more
Video November 26, 2018 GET TO KNOW YOUR WATER* Read more
Post January 16, 2019 WHAT HAPPENS TO WATER ONCE IT LEAVES YOUR HOME?* Read more
Video November 26, 2018 WE’RE MAXIMIZING OUR RESOURCES* Read more
* 1
* 2
* 3
* 4
SAVINGS & TIPS
Post November 26, 2018 SAVE WATER & REDUCE YOUR BILL LET EMWD HELP YOU SAVE WATER AND REDUCE YOUR BILL BY STAYINGWATERWISE!
Select from DropdownWaterWise Programs and RebatesInland Empire Landscape GuidebookWaterWise Landscape ToolboxSelect from Dropdown* Read more
* WaterWise Programs and Rebates * Inland Empire Landscape Guidebook * WaterWise Landscape Toolbox Post November 19, 2020 EMWD AND YOU: WORKING TOGETHER FOR A HEALTHY SEWER SYSTEM Perris, CA (November 19, 2020) — November 19, 2020, is World Toilet Day which was established by the United Nations to raise awareness of the importance of responsible wastewater systems and the role they play in protecting public health around the world. To commemorate the day, Eastern Municipal Water District (EMWD) encourages customers to be Sewer Smart by doing what they can to help protect our wastewater collection system. * World Toilet Day Fact Sheet* Read more
Post November 19, 2020 EMWD HOSTS VIRTUAL STATE OF THE DISTRICT Perris, CA (November 19, 2020) — Eastern Municipal Water District (EMWD) today hosted its virtual State of the District event to provide key stakeholders and customers with information on how EMWD is working toward a more resilient future. The biennial State of the District event was hosted virtually due to public health restrictions and to make the event accessible to all EMWD customers who want to learn more about how California’s sixth-largest retail water agency is working on their behalf.* Read more
Post November 4, 2020 EMWD BEGINS WORK ON MCCALL BOULEVARD PIPELINE REPLACEMENT PROJECT Perris, CA (November 4, 2020) — Eastern Municipal Water District (EMWD) this month began work to replace an aging portion of pipeline in McCall Boulevard in the City of Menifee. The McCall Boulevard Pipeline Replacement project will replace more than 6,000 linear feet of 12-inch pipeline between Bradley Road and Valley Boulevard. The existing pipeline is more than 50 years old and is being replaced as part of EMWD’s proactive replacement and refurbishment program.* Read more
Post October 8, 2020 EMWD’S STRONG FINANCIAL STANDING REAFFIRMED Perris, CA (October 8, 2020) — As many public agencies have faced difficult financial realities because of the ongoing pandemic and economic downturn, Eastern Municipal Water District has recently been reaffirmed as a model of financial stability by the major ratingagencies.
* Read more
Post September 28, 2020 EMWD ANNOUNCES NEW CHIEF FINANCIAL OFFICER Perris, CA (September 28, 2020) — Eastern Municipal Water District (EMWD) is pleased to announce that John Adams, who has an extensive history in public sector finance, has been hired as EMWD’s new ChiefFinancial Officer.
* Read more
* 1
* 2
* 3
* 4
* 5
Post November 26, 2018JUST FORKIDS
Check out our section just for kids! Find games, coloring activities, and more. Make learning about our water fun!* Explore
EVENTS AND MEETINGS
Meeting November 24, 2020 - 3:30pm Call-in number: (951) 384-0840Conference ID: 344 484 715# BOARD OPERATIONS AND ENGINEERING COMMITTEE MEETING (SULLIVAN/SLAWSON) CALL-IN NUMBER: (951) 384-0840 ~ CONFERENCE ID: 344 484 715#* Read more
Holiday November 26, 2020 THANKSGIVING DAY HOLIDAYEMWD OFFICES CLOSED
In observance of Thanksgiving, EMWD offices will be closed. view-billpayment-options* Read more
Holiday November 27, 2020 DAY AFTER THANKSGIVING HOLIDAYEMWD OFFICES CLOSED
In observance of the Day After Thanksgiving holiday, EMWD offices willbe closed.
view-billpayment-options* Read more
See More
Social Link January 4, 2019* Read more
Social Link December 6, 2018* Read more
Social Link December 6, 2018* Read more
Social Link December 6, 2018YOUTUBE
* Read more
Footer link December 6, 201824/7 EMERGENCY INFO
* Read more
Footer link December 6, 2018VIEW/PAY MY BILL
* Read more
Footer link December 6, 2018PROGRAMS & REBATES
* Read more
Footer link December 6, 2018NEWSROOM
* Read more
Footer link December 6, 2018WHO WE ARE
* Read more
Footer link December 6, 2018 GROUNDWATER RELIABILITY PLUS* Read more
Footer link December 6, 2018 EMWD INFRASTRUCTURE UPDATES* Read more
Footer link December 6, 2018 TELL US HOW WE’RE DOING* Read more
Footer Stat December 6, 201830%
OF OUR ENERGY USAGE PROVIDED THROUGH SOLAR FACILITIES* Read more
Footer Stat December 6, 2018100%
BENEFICIAL REUSE OF RECYCLED WATER ANNUALLY* Read more
Footer Stat December 6, 2018839,000
SERVED ACROSS A 555 SQUARE-MILE SERVICE AREA* Read more
* 1
* 2
* 3
Join EMWD!Careers
COMMANDS
* Help
* Log in
close
LOG IN
E-mail or username: *Password: *
Remember me
* Request new passwordORIGINAL TEXT
Contribute a better translation -------------------------Details
Copyright © 2024 ArchiveBay.com. All rights reserved. Terms of Use | Privacy Policy | DMCA | 2021 | Feedback | Advertising | RSS 2.0